I am having underfloor heating installed. It's between joists in a weak screed mix.
I want to fix tiles in the kitchen area and engineered wood in the dining area.
Should I fix ply (what thickness?) to the kitchen and tile over. Should the ply be glued or screwed to the joists?
With the engineered board should I get a thick board (20 - 22mm) and fix directly to the joists or glue to the screed, bearing in mind it's a weak mix or should i fix ply first?
I've been given conflicting information and am totally confused. Any advice greatly appreciated.
I want to fix tiles in the kitchen area and engineered wood in the dining area.
Should I fix ply (what thickness?) to the kitchen and tile over. Should the ply be glued or screwed to the joists?
With the engineered board should I get a thick board (20 - 22mm) and fix directly to the joists or glue to the screed, bearing in mind it's a weak mix or should i fix ply first?
I've been given conflicting information and am totally confused. Any advice greatly appreciated.