I have a rad to change position in a room and fit a new rad. All the other rads in the house are pipes flow to the top of rad. Return to the bottom
It's a sealed system combi boiler. Would there be any benefit of piping fitting the new rad the same. Have never done it like that before. Is it so the tenant doesn't have to bend down to operate the trv as well?
It's a sealed system combi boiler. Would there be any benefit of piping fitting the new rad the same. Have never done it like that before. Is it so the tenant doesn't have to bend down to operate the trv as well?