Hi, I love this site all you guys are great!!! I am hoping you can help me with a project I’ve got to do.
I’ve got to build a wall in my garden. I have dug the footings 18m long 60cm wide 60cm deep. The building inspector said he wants reinforcing bars running along these footings.
As I am mixing the concrete by hand, I’m going to section the footings off (into what I can do in the time it takes to set). Say I’ve got three cubic sections. If I do the two outer ones, let it set overnight, then put the middle one in, I am worried that they might move independently of each other and so affect the bricks (once laid) on top. I hope that makes sense.
When I was costing all this up, one merchant said to make the two outer ones stepped, put the bars in, then just fill the middle one up. Another merchant said to do 3 blocks but put something at the joints, a sheet of silicone or something.
I hope you can help me. What should I do?
Thanks for taking the time to read this!
I’ve got to build a wall in my garden. I have dug the footings 18m long 60cm wide 60cm deep. The building inspector said he wants reinforcing bars running along these footings.
As I am mixing the concrete by hand, I’m going to section the footings off (into what I can do in the time it takes to set). Say I’ve got three cubic sections. If I do the two outer ones, let it set overnight, then put the middle one in, I am worried that they might move independently of each other and so affect the bricks (once laid) on top. I hope that makes sense.
When I was costing all this up, one merchant said to make the two outer ones stepped, put the bars in, then just fill the middle one up. Another merchant said to do 3 blocks but put something at the joints, a sheet of silicone or something.
I hope you can help me. What should I do?
Thanks for taking the time to read this!