I'm trying to work out the sand and cement for building a straight wall and 3 pillars. The wall is 37m and the pillars are 2 blocks on flat upto a height of 1.3m
40 linear Meters bed of mortar x 0.100 wide x 0.016mm high = 0.06 x 5 beds of mortar= 0.3 ton. Throw in 0.2 ton for the pillars as over estimated and thsts 0.5 ton sand.
Only rendering one side of the block wall. Pillars and other side to be faced in stone.
My calculations for the sand is 40 linear Meters x 1m high x 25mm thick(12.5 each coat)
40x1x0.025 = 1.
Going by these measurements above, I should need 1 ton sand. At a guess, half bag cement per meter. 18 bags estimate.
So, 1.5 ton sand , 18 bags for render and ? Bags for building the blocks.
Now, go easy on me if my calculations are all wrong hahaha
40 linear Meters bed of mortar x 0.100 wide x 0.016mm high = 0.06 x 5 beds of mortar= 0.3 ton. Throw in 0.2 ton for the pillars as over estimated and thsts 0.5 ton sand.
Only rendering one side of the block wall. Pillars and other side to be faced in stone.
My calculations for the sand is 40 linear Meters x 1m high x 25mm thick(12.5 each coat)
40x1x0.025 = 1.
Going by these measurements above, I should need 1 ton sand. At a guess, half bag cement per meter. 18 bags estimate.
So, 1.5 ton sand , 18 bags for render and ? Bags for building the blocks.
Now, go easy on me if my calculations are all wrong hahaha