Hi All,
Been reading with interest and was wondering on the following...
1, new shed installed....50 m from indoor CU....
2. was thinking of using SWA and run U/G (groan..a long days work..)
and was thinking...
Q. is their a formula rto work out the Voltage drop (VD) over this run, and is it just too far...what do I need to do?
I will need to have maybe 2 sockets and lights..and estimate around 20A of load at most...with normal being just power tool,, fridge for beers...TV
And is 4mm or 6mm SWA ok?
looking forward to replies on how best to tackle.
Regards
Steve
___________________________________________
Moderator
split from "hi jacked" question
Been reading with interest and was wondering on the following...
1, new shed installed....50 m from indoor CU....
2. was thinking of using SWA and run U/G (groan..a long days work..)
and was thinking...
Q. is their a formula rto work out the Voltage drop (VD) over this run, and is it just too far...what do I need to do?
I will need to have maybe 2 sockets and lights..and estimate around 20A of load at most...with normal being just power tool,, fridge for beers...TV
And is 4mm or 6mm SWA ok?
looking forward to replies on how best to tackle.
Regards
Steve