Hi, new to the site and requiring some help with an extension I'm building.
I have dug out for trench footings and have a clay foul water pipe running through the corner of my footings And separates the front and side trenches, the building inspector would like me to lintel over it but the height of it is in the middle of my footings and Im just at a loss how to do this.
can I construct a 18mm ply wood box filled with pea shingle and then pour my footings or should I shutter either side of the pipe bed some lintels allow them to set and then finish the pour?
Any help on the matter would be greatly appreciated, Ash
I have dug out for trench footings and have a clay foul water pipe running through the corner of my footings And separates the front and side trenches, the building inspector would like me to lintel over it but the height of it is in the middle of my footings and Im just at a loss how to do this.
can I construct a 18mm ply wood box filled with pea shingle and then pour my footings or should I shutter either side of the pipe bed some lintels allow them to set and then finish the pour?
Any help on the matter would be greatly appreciated, Ash