Hi, I have a couple of questions about a friend's new extension:
1: If a foundation for a 1-floor (aprox 12 square meters) extension was incorrectly laid, using only concrete (no mesh reinforcement) would it be possible to correct the problem by later digging down (after the extension has been built) and laying concrete and iron mesh reinforcement in overlapping sections?
2, Provided that there is the correct reinforced concrete foundation under the main walls, would that be sufficient, or does the reinforced concrete have to be under the entire floor area? Thanks you..
1: If a foundation for a 1-floor (aprox 12 square meters) extension was incorrectly laid, using only concrete (no mesh reinforcement) would it be possible to correct the problem by later digging down (after the extension has been built) and laying concrete and iron mesh reinforcement in overlapping sections?
2, Provided that there is the correct reinforced concrete foundation under the main walls, would that be sufficient, or does the reinforced concrete have to be under the entire floor area? Thanks you..