Hi All

Is it a problem to apply the top coat to a fibreglass flat roof 8-10 days after application of the resin/matt layer? What do you think?

Thanks
 
Sponsored Links
Hi All

Is it a problem to apply the top coat to a fibreglass flat roof 8-10 days after application of the resin/matt layer? What do you think?

Thanks
Clean and dry roof first.

Sand laminated deck with P40 sandpaper and wipe down with acetone. Promotes inter-laminate adhesion. Always aim to apply the topcoat within 24 hours of laminating the deck. If not possible sand roof to gain a key then wipe with acetone prior to topcoating.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top