So I’ve lifted the uneven quarry tiles hoping to find a solid concrete base to lay an approx 40mm screed down to level the floor to my new kitchen slab. Kind of hopeful for a 100 year old floor. Well, as expected, crap concrete, some hard, some the consistency of hard earth. In addition it’s fairly damp as no DPM. What we’re they thinking if 100 years ago?!
Resides myself to the fact of a full 300mm dig out, mot, blinding, dpm, insulation, concrete pour.
Does this route sound sensible? How long for a 100mm slab to dry out for tiling? 100 days? Please tell me not.