B
boydey
Where do I start this has been a nightmare from day 1 of speaking to planning, but I got it passed but she wont certify the work now due to the concrete foundation at the garage door.
My garage is completed my drawing that was passed showed using the existing strip foundation , and brick founds ( I had the drws & details from my house builder and were submitted and passed with my warrant) breaking out the concrete slab and building new brickwork on top of the existing.
When the planning officer came to site she said that i had not created a foundation as the tarmac had not been cut, and that she could not see the dpc through the brickwork.
I quickly explained to her that it was a existing foundation as per the drawing.
The only thing I have not done as per the drw is break out the concrete slab the bricks sit on the existing.
My builder has spoke to her and confirmed everything but she says now there is cold spots .
There is a existin dpc below the existing concrete slab a new dpc above the concrete slab insultation in the new raised timber floor , 22mm chipboard and 18mm hardwood flooring, in the wall there is brickwork , timber frame, dpc,kingspan insulation & plasterboard.
I have spoke to a structural engineer who says the found is fine.
She however is adament that everything has to be took down the concrete slab cut out and new brick work installed.
Can she make me do this even though I comply with the building standards the only prob is the detail on my drw differs.
My garage is completed my drawing that was passed showed using the existing strip foundation , and brick founds ( I had the drws & details from my house builder and were submitted and passed with my warrant) breaking out the concrete slab and building new brickwork on top of the existing.
When the planning officer came to site she said that i had not created a foundation as the tarmac had not been cut, and that she could not see the dpc through the brickwork.
I quickly explained to her that it was a existing foundation as per the drawing.
The only thing I have not done as per the drw is break out the concrete slab the bricks sit on the existing.
My builder has spoke to her and confirmed everything but she says now there is cold spots .
There is a existin dpc below the existing concrete slab a new dpc above the concrete slab insultation in the new raised timber floor , 22mm chipboard and 18mm hardwood flooring, in the wall there is brickwork , timber frame, dpc,kingspan insulation & plasterboard.
I have spoke to a structural engineer who says the found is fine.
She however is adament that everything has to be took down the concrete slab cut out and new brick work installed.
Can she make me do this even though I comply with the building standards the only prob is the detail on my drw differs.