Hi
I am replacing a concrete lintel above a garage door on a 9" wall. It was shuttered and poured in situ, and therefore the concrete is stuck to the headers on the outer skin, holding the bricks in place. now when i take the concrete out i will also have to remove the headers. i cannot put a lintel in for outer brickwork as they finish half way between a course!
I thought of just putting the lintel on the next course up, but this leaves a gap of about an inch between top of the garage door and the brickwork.
Any ideas of a solution anyone?
cheers!!!
I am replacing a concrete lintel above a garage door on a 9" wall. It was shuttered and poured in situ, and therefore the concrete is stuck to the headers on the outer skin, holding the bricks in place. now when i take the concrete out i will also have to remove the headers. i cannot put a lintel in for outer brickwork as they finish half way between a course!
I thought of just putting the lintel on the next course up, but this leaves a gap of about an inch between top of the garage door and the brickwork.
Any ideas of a solution anyone?
cheers!!!