Hello All,
I require two garden lights wiring up about 5m from the house. The plan is to use a FCU taken from an indoor socket and have the external cabling in SWA, dug to a depth of approx 60cm. The circuit is currently protected by a fixed RCD. Is this work notifiable or not? I am a bit confused with the newer regulations.
Cheers
I require two garden lights wiring up about 5m from the house. The plan is to use a FCU taken from an indoor socket and have the external cabling in SWA, dug to a depth of approx 60cm. The circuit is currently protected by a fixed RCD. Is this work notifiable or not? I am a bit confused with the newer regulations.
Cheers