Hi all,
I have recently dug out a large area of sloping garden that came right up to the back of the house.
I am now left with a two tiered garden of about 1 meter difference and an awful sandstone and mud bank facing us as we come out into the garden.
I would like to contain the bank using either 3" or 4" square tanalised posts concreted into the ground at 6' centers with some kind of ply behind them to contain the soil and then "face off" the front with horizontally fixed decking or similar material that wont shrink and show gaps in between.
Has anyone had experience of doing a similar project and what materials should I use for the ply going face to face with the soil?
Thanks in advance.
I have recently dug out a large area of sloping garden that came right up to the back of the house.
I am now left with a two tiered garden of about 1 meter difference and an awful sandstone and mud bank facing us as we come out into the garden.
I would like to contain the bank using either 3" or 4" square tanalised posts concreted into the ground at 6' centers with some kind of ply behind them to contain the soil and then "face off" the front with horizontally fixed decking or similar material that wont shrink and show gaps in between.
Has anyone had experience of doing a similar project and what materials should I use for the ply going face to face with the soil?
Thanks in advance.