I am installing a new combi boiler rated at 39.6 Kw (135115 BTU/hr) gross input. This will be fed through 10.5 m of gas pipe with a gas cooker and hob teeing off after 6m. Are there any Corgis out there who can advise whether I should be going for 28mm pipe for all or some of the run? I will be getting a Corgi to connect to the supply and commision but want to get the work done on the piping.