Hi
What are the regs around the supply pipe to a Gas meter in Lead. Is it within regs do I need to do anything about it, who is responsible for it.
The meter is within the house and all the pipe after the meter is in copper. The house is tenanted and has had CP12s' carried out for the last 10 years and the engineer has only just raised mentioned the supply pipe as an issue.
Thanks for your help
What are the regs around the supply pipe to a Gas meter in Lead. Is it within regs do I need to do anything about it, who is responsible for it.
The meter is within the house and all the pipe after the meter is in copper. The house is tenanted and has had CP12s' carried out for the last 10 years and the engineer has only just raised mentioned the supply pipe as an issue.
Thanks for your help