I have recently had my detatched garage converted to a granny annex, and in the annex i am having a new central heating system. I am looking to get a gas safe engineer in,to fit a gas supply over to the annex.
a friend of mine (who is to busy to undertake the work)
briefly had a look and told me that the first thing i need to get done is have my meter upgraded to a 16 ?
the boiler will be fitted to the wall nearest to my house, which is 44metres from the meter, the question i want to ask, so i can get an idea of costs is what sort of size pipe will this have to be??
My friend also told me an easier option might have been to have a new supply fitted to the annex but due to planning issues it all has to go through my house meter
a friend of mine (who is to busy to undertake the work)
briefly had a look and told me that the first thing i need to get done is have my meter upgraded to a 16 ?
the boiler will be fitted to the wall nearest to my house, which is 44metres from the meter, the question i want to ask, so i can get an idea of costs is what sort of size pipe will this have to be??
My friend also told me an easier option might have been to have a new supply fitted to the annex but due to planning issues it all has to go through my house meter