I'm rewiring some stretches of this house I'm remodeling [ 1 & 1.5mm on some of the socket ring, nail and rodent damage etc ].
Client has asked me to lift as few floorboards as is possible - but I want to clip cable to joists upstairs and down - would it be considered to be acceptable if I clip cable to lengths of wood and feed lengths alongside joists and screw to joist at each end [access point ]? - thereby holding the cable in place, off of the ceiling and concrete [ under ground floor boards ] and only having to open up a few points of access?
Client has asked me to lift as few floorboards as is possible - but I want to clip cable to joists upstairs and down - would it be considered to be acceptable if I clip cable to lengths of wood and feed lengths alongside joists and screw to joist at each end [access point ]? - thereby holding the cable in place, off of the ceiling and concrete [ under ground floor boards ] and only having to open up a few points of access?