I am contemplating changing the gravity fed system in my house for a main pressure closed system. Mainly to make more room in the loft.
Someone has mentioned that I will need to changed the water cylinder for a bigger version if I switch over, also that one reaosn for switching over is that more components are made for mains pressure systems now.
I can see how the first would make sense, using more water with a higher flow rate...are they both correct?
Thanks
I am contemplating changing the gravity fed system in my house for a main pressure closed system. Mainly to make more room in the loft.
Someone has mentioned that I will need to changed the water cylinder for a bigger version if I switch over, also that one reaosn for switching over is that more components are made for mains pressure systems now.
I can see how the first would make sense, using more water with a higher flow rate...are they both correct?