Hi,
am going to be digging 12 off 600mm square holes approx 1200mm deep. Due to various jobs/travelling/commitments i'm not going to get a good run at this at all and take ages to do what could be done a lot quicker. Ground seems fairly loose from first hole i have started and am concerned by the time i finished them all for barrowing in concrete the side walls will have caved in a bit and not have good straight sides on them.
Is there a trench wall liner that you can get that is ok to leave in place when you pour in concrete? I have seen something that looked like this on a building site before but not sure what make the material was or whether it is acceptable
Thanks in advance
am going to be digging 12 off 600mm square holes approx 1200mm deep. Due to various jobs/travelling/commitments i'm not going to get a good run at this at all and take ages to do what could be done a lot quicker. Ground seems fairly loose from first hole i have started and am concerned by the time i finished them all for barrowing in concrete the side walls will have caved in a bit and not have good straight sides on them.
Is there a trench wall liner that you can get that is ok to leave in place when you pour in concrete? I have seen something that looked like this on a building site before but not sure what make the material was or whether it is acceptable
Thanks in advance