- Joined
- 9 May 2004
- Messages
- 3
- Reaction score
- 0
- Country
Hi, I am looking to move the hot water cylinder from my airing cupboard to the loft, creating room for a separate shower. The system is fully pumped, etc which should provide no problems. The only question is installing the interconnecting pipes between the current and new system. I would prefer to place them inside the wall panels to give maximum space, but I have dry lined walls. Is there a correct method of installing pipes in this type of wall? Or is it a case of enclosing the pipes separately.
Hope someone can help!!
Dan
Hope someone can help!!
Dan