I've a system boiler with Hive smart control and pressurize cylinder and I control the hotwater through app schedule to reduce bill. Please can someone help me is there a way if cylinder is already full hot water won't come on as per schedule? as I noticed schedule always run the boiler no matter if hotwater heat required or not so looking for a smart solution to cut the bill only hot water turns on if the cylinder need water warmed up? Please any expert help how I can do that or recommand any product?