looking for a rough idea of a cost to re-plumb a 1930's 4 bedroom semi detached house in london.
currently running on lead mains with a mix of 15mm copper and push fit pipes. Will be 3 bathrooms and kitchen, only need 1st fix for now.. for hot cold water only, as would be going for underfloor heating so no radiators,
would this be better to do at a day rate? what would i be looking at?
hamazz
currently running on lead mains with a mix of 15mm copper and push fit pipes. Will be 3 bathrooms and kitchen, only need 1st fix for now.. for hot cold water only, as would be going for underfloor heating so no radiators,
would this be better to do at a day rate? what would i be looking at?
hamazz