- Joined
- 1 Sep 2005
- Messages
- 2
- Reaction score
- 0
- Country
I have a 6ft deep pit in my garage which has a cement floor and breeze block sides. Over time it fills with water. I want to fill this pit in (with the soil left over from digging a pond) would I need to smash/crack the floor so the water would drain away? or drill holes in the floor or something before filling it with soil... or should I just leave well alone? thanks.