I had my boiler replaced last October and changed from an enclosed system to a combi boiler.
At the moment I retile my bathroom and had to take off the radiator/ towelrail the plumber installed new 7 months ago.
It was full of that little nasty black debris.
So I have ordered Sentinel X400 what I will fill in to the radiator and let it run for a while (possibly a few weeks) and then intend to drain down the System.
I will switch off the central heating and then drain down the System.
How often shouyld I drain and refill the system before it is OK to refill and add the inhibitor ?
Any further tips will be very much apreciated.
Is there maybe a flushing maschine that I can hire from the Tool hire places all over the country ? When yes what is it called.
Thank you in advance
Peter
At the moment I retile my bathroom and had to take off the radiator/ towelrail the plumber installed new 7 months ago.
It was full of that little nasty black debris.
So I have ordered Sentinel X400 what I will fill in to the radiator and let it run for a while (possibly a few weeks) and then intend to drain down the System.
I will switch off the central heating and then drain down the System.
How often shouyld I drain and refill the system before it is OK to refill and add the inhibitor ?
Any further tips will be very much apreciated.
Is there maybe a flushing maschine that I can hire from the Tool hire places all over the country ? When yes what is it called.
Thank you in advance
Peter