Current constructional hearth needs to be dug away and then re-levelled with "a screed", according to my floor guy. Firstly, what sort of screed - anything special you should use for hearths? Secondly, how do I then bed the granite hearth on top of this - what do I use? And what thickness would whatever I use need to be? (I am doing the hearth flush to the floor so I need to work out exactly what level to bering the screed up to).
Thanks!
Thanks!