Hi all,
Finally poured the concrete in my dining room floor today
Its 100mm thick with mesh in and I have got within an approx 5mm tolerance I reckon, then given it a wood float finish
How long before I can walk on it and go over it with a steel trowel to finish it off?
Finally poured the concrete in my dining room floor today
Its 100mm thick with mesh in and I have got within an approx 5mm tolerance I reckon, then given it a wood float finish
How long before I can walk on it and go over it with a steel trowel to finish it off?