Hi,
I am having a new bathroom fitted, and I am having the walls plastered before tiling. As we are without a bathroom and toilet from beginning the plastering I am keen to get the tiling started as soon as possible afterwards.
How long should the plaster take to dry before tiling can commence?
Many Thanks,
Stuart
I am having a new bathroom fitted, and I am having the walls plastered before tiling. As we are without a bathroom and toilet from beginning the plastering I am keen to get the tiling started as soon as possible afterwards.
How long should the plaster take to dry before tiling can commence?
Many Thanks,
Stuart