Our place is getting drywalled at the moment - I bought 35 sheets of 2.4*1.2 plasterboard.
Two guys have been working on this for about 4 days now - Does that sound long to you or not? I honestly thought it would take a lot less time to put these up.
Some of the boards have been dot and dabbed and others have been fitted to stud walls that were there previously
It is true a lot of these boards had to be cut but does putting up dry wall take such a long time?
Two guys have been working on this for about 4 days now - Does that sound long to you or not? I honestly thought it would take a lot less time to put these up.
Some of the boards have been dot and dabbed and others have been fitted to stud walls that were there previously
It is true a lot of these boards had to be cut but does putting up dry wall take such a long time?