I plan to lay a concrete floor approx. 14 sqr metres depth of 100mm.Can you advise how much ballast I need working on a 5:1 ballast/cement mix?
I think this is about 1.4 cubic metres.I imagine something around 2 tonnes of ballast and 16 bags cement with some thing to spare .
I think this is about 1.4 cubic metres.I imagine something around 2 tonnes of ballast and 16 bags cement with some thing to spare .