Hi, I've been really struggling to get help with a concrete block retaining wall. It's on a slight slope in our garden and we're wanting to level it for a garden office.
It would be 8-9m long and 90cm high. It would need a concrete base and a bit if block foundation. The ground is soil then about 10 inches down clay. The ground is clear. It will probably need to be twin skin.
We've been trying to get someone to just do the wall. We had a guy come and say it would take about a day for two of them to come do the wall, but he didn't have time. Then we've had quotes from two other guys that it will take two of them about a week.
Why is there a 5 times difference in how long people think it will take? We're struggling to understand the huge jump in price.
How long should a twin skin 8-9m block wall take to base and lay?
Thanks for your help!
It would be 8-9m long and 90cm high. It would need a concrete base and a bit if block foundation. The ground is soil then about 10 inches down clay. The ground is clear. It will probably need to be twin skin.
We've been trying to get someone to just do the wall. We had a guy come and say it would take about a day for two of them to come do the wall, but he didn't have time. Then we've had quotes from two other guys that it will take two of them about a week.
Why is there a 5 times difference in how long people think it will take? We're struggling to understand the huge jump in price.
How long should a twin skin 8-9m block wall take to base and lay?
Thanks for your help!