How much should a plumber charge, on average for a job which includes the below. I assume it will take a whole day for me as i'm just starting out.
1) Replace an old electric shower with a new one, like for like
2) Fit a stop cock to an mains pressure pipe to the outside toilet
3) install a small basin to the outside toilet.
Can someone give me a rough guestimate? What would be a fair price?
1) Replace an old electric shower with a new one, like for like
2) Fit a stop cock to an mains pressure pipe to the outside toilet
3) install a small basin to the outside toilet.
Can someone give me a rough guestimate? What would be a fair price?