me and my mate have just finished installing a bathroon suite at a friends house. the job involved ripping out old suite installing new bath, basin, toilet and shower. the old shower was a gravity fed pumped one with surface mounted piping, we have now sunk the pipework into the partition wall.
also we had to put new waste in for the basin, then tile three of the four walls abt 14 sq metres and also tile the floor abt 10 sq metres.
the job took five days and we charged £1100.
have we charged too cheaply? the reason i ask this is because the neighbours from nxt door popped in and said they would like us to do their bathroom of a similar size.
any ideas fellas as to what is a fair price?
also we had to put new waste in for the basin, then tile three of the four walls abt 14 sq metres and also tile the floor abt 10 sq metres.
the job took five days and we charged £1100.
have we charged too cheaply? the reason i ask this is because the neighbours from nxt door popped in and said they would like us to do their bathroom of a similar size.
any ideas fellas as to what is a fair price?