how to attach roughcast to mesh (no bricks behind)

Joined
16 Aug 2006
Messages
1
Reaction score
0
Location
Shropshire
Country
United Kingdom
Hi. We have a house built in 1932 and need to replace blown roughcast between the ground floor and 1st floor bay windows. Trouble is, the base render is fixed to steel mesh, with nothing behind it. The section above the ground floor window is okay as we removed the plaster inside and insulated last year, so it's solid. But the room above is not on our schedule to do for ages (can't afford to) so this section is going to remain uninsulated, and therefore not solid, for a while. How on earth am I going to get the render to stick? (And how on earth did they get it to stick in the first place - they must have mixed it with horsehair). I thought of putting a layer of hessian, or perhaps muslin as hessian might be too thick, on top of the mesh and the render will stick to that. What do you think?
 
Sponsored Links
The render is mixed slightly stiffer than normal and applied to mesh. Not much sticks first time but whatever does is left to cure - 24 hrs or so. This usually provides a good enough key for a scratch coat.

Hope this puts your mind at rest!
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top