Hi guys hope someone can help me I'm a fully qualified slater / roughcaster and use to having all my matiral drop off for me with normally loads spare lol. I was measuring a wee job and drew kinda blank to how much granite dust to order the customers paying to get it delivered in bulk and don't want to order to much.
It's 50m2
Ratio : 4:1 scratch 5:1 topcoat 4:1 wetcast
And if my calculations are correct I've got
1 tonne of plastering sand / wash building sand
10 bags of cement (for the render)
I'll need extra for the wet cast
And granite I'm not sure ??? Please help
It's 50m2
Ratio : 4:1 scratch 5:1 topcoat 4:1 wetcast
And if my calculations are correct I've got
1 tonne of plastering sand / wash building sand
10 bags of cement (for the render)
I'll need extra for the wet cast
And granite I'm not sure ??? Please help