I am starting a loft conversion.
I require 8 High PC Concrete Lintels as padstones to bear the steels onto, they are all 150mm high, 100 wide - and varying lengths (330-900mm, average 700mm). Trying to work out the value of concrete, for costing - say if the big one is 0.150x0.100x0.900=0.0135 cu mt ... is that correct ?? its a tiny volume)
Could I make these myself, they come to £300 pre-made.
Looking at a cross section of premade's, they have 2 strips of rebar running through, and I assume a particular mix designation.
How long should they be left to cure.
Would the building control inspector be fussed ? ie require receipts of purchase to confirm where they'd come from.
I require 8 High PC Concrete Lintels as padstones to bear the steels onto, they are all 150mm high, 100 wide - and varying lengths (330-900mm, average 700mm). Trying to work out the value of concrete, for costing - say if the big one is 0.150x0.100x0.900=0.0135 cu mt ... is that correct ?? its a tiny volume)
Could I make these myself, they come to £300 pre-made.
Looking at a cross section of premade's, they have 2 strips of rebar running through, and I assume a particular mix designation.
How long should they be left to cure.
Would the building control inspector be fussed ? ie require receipts of purchase to confirm where they'd come from.