how to refill vent and pressurise a glowworm 30cxi

Joined
28 Mar 2010
Messages
5
Reaction score
0
Location
Middlesex
Country
United Kingdom
Hi all,

I am going to replace the Reduced pressuse zone valve / tube and filling loop valve,

Part Glowworm 2000802600.

Basically i can work out what need to be done to get the part replaced i can do that it the part that the manual refers to about:-

"refill, vent and pressurise the boiler" mean

Refill i guess is turning the water supply to the boiler back on.

Vent?? that whats got me, is it something cleaver and differcult or is it just turning on a tap??

Pressurise i guess is opening the filling lopp to alolow water int eh boiler to pressurise??

Any help on ths would be great!!

Cheers

Neil Martin
 
Sponsored Links
vent the rads and repressurise system to approx 1.5 bar
then disconnect water supply
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top