Hi guys
I have to make up levels prior to tiling and after UFH cement boards are laid. This is so the finished floor level is flush with the sliding door aluminium frame.
After the UFH boards 18mm I have 35mm to get a flush level. The tile is 11mm, 3mm DITRA and 6mm adhesive leaves me with 15mm.
If I use self levelling compound this will be the best option but a lot
Of work. Could I use plywood or even Celotex type board?
Any suggestions welcomed!
Thanks
Mikeinthemidlands
I have to make up levels prior to tiling and after UFH cement boards are laid. This is so the finished floor level is flush with the sliding door aluminium frame.
After the UFH boards 18mm I have 35mm to get a flush level. The tile is 11mm, 3mm DITRA and 6mm adhesive leaves me with 15mm.
If I use self levelling compound this will be the best option but a lot
Of work. Could I use plywood or even Celotex type board?
Any suggestions welcomed!
Thanks
Mikeinthemidlands