Hi
I've got an idea to run the hot and colds up to and isolating valve then onto a equal tee with one feed going off to the tap and the other to the shower. I might need an elbow at the bottom of each shower pipe so it all lines up straight with the tees.
As you can see space is tight so would anyone do it differently? Just trying to minimise joints really.
All would be push fit, probably JG.
Thanks
I've got an idea to run the hot and colds up to and isolating valve then onto a equal tee with one feed going off to the tap and the other to the shower. I might need an elbow at the bottom of each shower pipe so it all lines up straight with the tees.
As you can see space is tight so would anyone do it differently? Just trying to minimise joints really.
All would be push fit, probably JG.
Thanks