Hi would be grateful for some advice please .....
we have the ideal mexico super 2 rs100 (balanced flue) floor mounted in kitchen in what used to be a huge fire place...boiler still going strong & clean but looks darn ugly as we are on gravity feed and you can see the pump, pipes and taps.
Would like to install unit door fronts around the front and silestone worktop above. Would be putting ventilation in plinth. the inside of the fire place is 90cm wide and 55 cm deep (the boiler sits within that space)
Instruction manual only says it needs clearance of 10mm either side and 20mm above ....but by me applying practical doors and boxing in how does that effect it....would i need to vent the silestone worktop too?
Many thanks.....
we have the ideal mexico super 2 rs100 (balanced flue) floor mounted in kitchen in what used to be a huge fire place...boiler still going strong & clean but looks darn ugly as we are on gravity feed and you can see the pump, pipes and taps.
Would like to install unit door fronts around the front and silestone worktop above. Would be putting ventilation in plinth. the inside of the fire place is 90cm wide and 55 cm deep (the boiler sits within that space)
Instruction manual only says it needs clearance of 10mm either side and 20mm above ....but by me applying practical doors and boxing in how does that effect it....would i need to vent the silestone worktop too?
Many thanks.....