I have a house with ten old rads with all in imperial sizes.
All new rads are metric and are standard 1000, 1200, 1400 etc etc. This will cause loads of pipework alterations. Does anybody know of a quick solution, without chopping up existing pipework?
All new rads are metric and are standard 1000, 1200, 1400 etc etc. This will cause loads of pipework alterations. Does anybody know of a quick solution, without chopping up existing pipework?