I've just moved into a 1950's built house. It has lovely bakerlite black fittings on the wall and a fuse box that is just plain old. The supply comes into the house on an overhead cable and the Electrical Supplier does not provide an earth so I have an earth rod. Which I believe is a TT system.
I'm going to replace the fusebox with a new consumer unit. Now my question is, should I just put in new CU with MCB's or should I look to put RCD's on all the circuits? I'm worried that the whole CU will trip with this set up. Do I need a main time delayed RCD in the CU?