Hi
I am installing my Indian stone paving soon
My patio will be level from left to right but sloping from front to back
The area is 4m wide and 2.7m from front to back
When laying my Indian stone, is it best to work across the botttom from L to R and then repeat, or is it best to work upwards, starting at the edge and moving upwards?
I have concrete edging to work to (patio level with top of edging). What’s the best way to ensure I get the correct fall to ensure It will be level with the edging at either side?
From L to R I plan on using a level spirit however with the slope is it best to connect a string line to the top of each edge (front and back) and keep the paving flat to the string line?
Pic below. Edging still to finish across top
Cheers
I am installing my Indian stone paving soon
My patio will be level from left to right but sloping from front to back
The area is 4m wide and 2.7m from front to back
When laying my Indian stone, is it best to work across the botttom from L to R and then repeat, or is it best to work upwards, starting at the edge and moving upwards?
I have concrete edging to work to (patio level with top of edging). What’s the best way to ensure I get the correct fall to ensure It will be level with the edging at either side?
From L to R I plan on using a level spirit however with the slope is it best to connect a string line to the top of each edge (front and back) and keep the paving flat to the string line?
Pic below. Edging still to finish across top