I am removing an existing HW cylinder cupboard to enlarge the rooms it "sits" within. Currently the door to the room and the cupboard both come off the main landing. When complete there will just be one door going into the one room. The existing walls are brickwork which is my preference over studwork generally but not a must.
My original plan wast to just remove the door frame from the cupboard and either block up or infill with stud work but i am concerned that this will leave a week wall given that the walls to the cupboard are being removed and these must have added some stability. I am mindful that this is a small area of wall with 2 openings in it currently.
Should I;
1) Infill doorway in stud (will this for ever crack along the joint of existing brick and new stud when skimmed over)
2) Infill doorway in block
3) Remove wall to area marked and rebuild in full tying it into the supporting walls at either end with wall ties.
Help much appreciated.
My original plan wast to just remove the door frame from the cupboard and either block up or infill with stud work but i am concerned that this will leave a week wall given that the walls to the cupboard are being removed and these must have added some stability. I am mindful that this is a small area of wall with 2 openings in it currently.
Should I;
1) Infill doorway in stud (will this for ever crack along the joint of existing brick and new stud when skimmed over)
2) Infill doorway in block
3) Remove wall to area marked and rebuild in full tying it into the supporting walls at either end with wall ties.
Help much appreciated.