I am installing a new soil stack. I have 110mm plastic pipe going through the wall which needs to connect into the stack. Having come through the wall if I use a 45 degree bend (push fit) before going into the stack, unless I sink the joint into the wall it sits very proud of the wall. It does not seem right that there should be a joint in the wall as if it leaks the consequences will not be that good.
Any help as to what to use would be appreciated
Thanks
Any help as to what to use would be appreciated
Thanks