the project is in a 1970s 36 story, concrete slab building. There is existing oak parquet flooring. My contractor says it is too hard to get the old parquet flooring up and has started to put down a sub floor over the parquet and intends to lay the hardwood floor over that.
Please let me know if this technique is proper.
[email protected]
Please let me know if this technique is proper.
[email protected]