Hi. I am intending to install ensuite into two adjoining bedrooms. The soil pipe distance to the furthest WC would be 5.2 Metres to the plastic existing soil/vent pipe. Would this be ok if installed under the floor in terms of fall? Floor void is approx 30cm.
Would it be possible to join the two new new wc's into the same soil pipe as they will only be approx 1 meter apart?
Can wastes from sink/shower be joined to soil pipe or would these need taking back to soil/vent stack?
Thanks for any advice with this planning stage.