Thanks in advance for your views
I’ve had a brickie come and block up an external doorway. It’s a little scrappy as he had to finish from the outside only. I will fill any gaps in the mortar before proceeding.
I’m planning on using the area as a utility area with a stacked washer and dryer.
I plan on insulating the wall and then drilling through to fit a 40mm waste pipe.
My current plan is to create a stud frame attached to the side walls (not the exposed brick, then add kingspan board and finally vapour barrier plasterboard.
I have a general question - is this ok?
and some specific questions
1 - do I need to damp proof the concrete floor?
2 - do I need to add a weep hole at the base of the brickwork?
3 - do I need to have a 50mm gap between the brickwork and the stud frame?
4 - would it be best to add the insulation board over the stud frame or in between the battens?
Many thanks
Andy
I’ve had a brickie come and block up an external doorway. It’s a little scrappy as he had to finish from the outside only. I will fill any gaps in the mortar before proceeding.
I’m planning on using the area as a utility area with a stacked washer and dryer.
I plan on insulating the wall and then drilling through to fit a 40mm waste pipe.
My current plan is to create a stud frame attached to the side walls (not the exposed brick, then add kingspan board and finally vapour barrier plasterboard.
I have a general question - is this ok?
and some specific questions
1 - do I need to damp proof the concrete floor?
2 - do I need to add a weep hole at the base of the brickwork?
3 - do I need to have a 50mm gap between the brickwork and the stud frame?
4 - would it be best to add the insulation board over the stud frame or in between the battens?
Many thanks
Andy