Building a timber frame with 50mm PIR insulation boards in between.
Should these be flush against the front of the stud work or set back slightly?
I'm thinking if I set them back I can fill what gaps I have with expanding foam more easily, but might this then cause cold bridging in the gap between insulation and plaster board?
Should these be flush against the front of the stud work or set back slightly?
I'm thinking if I set them back I can fill what gaps I have with expanding foam more easily, but might this then cause cold bridging in the gap between insulation and plaster board?