The joists in my loft are just 70mm. Is it OK to put down a 100mm roll between the joists and then lie a second 100mm so that this layer goes across the joists to meet the recommended minimum depth? Are there any issues (condensation?) that means that the joists should not be covered and left to breath? Is the second layer really worthwhile? The area that this applies to is a small second roof space which I'm not interested in boarding.
Thanks.
Thanks.