Hi,
I've got a shower head that screws into the tiled wall (male thread on chromed arm):
http://i67.photobucket.com/albums/h316/goodproducts101/Dsc00249.jpg
http://i67.photobucket.com/albums/h316/goodproducts101/DSC00248.jpg
I've put plenty ptfe tape on it and screwed it into the wall however, it still leaks. If I tighten the arm as mush as possibe, it ends up pointing at the toilet...
There are other threads on this forum that deal with this problem, but they just recoment using more ptfe tape.
I've got 15 turns on the male thread already. If I add more ptfe, will it disintegrate in the months years to come and cause a leak again, or is this method good for many years?
Any other options?
Thanks,
I've got a shower head that screws into the tiled wall (male thread on chromed arm):
http://i67.photobucket.com/albums/h316/goodproducts101/Dsc00249.jpg
http://i67.photobucket.com/albums/h316/goodproducts101/DSC00248.jpg
I've put plenty ptfe tape on it and screwed it into the wall however, it still leaks. If I tighten the arm as mush as possibe, it ends up pointing at the toilet...
There are other threads on this forum that deal with this problem, but they just recoment using more ptfe tape.
I've got 15 turns on the male thread already. If I add more ptfe, will it disintegrate in the months years to come and cause a leak again, or is this method good for many years?
Any other options?
Thanks,